What you need
- A site address or lot reference.
- A rough scheme (unit count and average size, or GFA).
- A construction rate per square metre. Defaults are fine if you do not have one yet.
The 90 second path
- Click New project and enter the address.
- Accept the pre-filled site controls or override them.
- Set unit count and average size. Popurise calculates GFA and selects a typology.
- Open the costs panel and accept the defaults.
- Open finance and set your loan to value ratio. Popurise sizes the facility.
Outputs and cashflow appear immediately. From here, refine any input and watch the numbers move.